Current Projects

Listings of all environmental assessment activity information for current projects can be found on this page.

For a summary of current projects, see:

AHP Development Corporation

Proponent Project: Amisk Hydroelectric Project - Latest Update: Mar 7, 2016

Responsible Director: AEP
Location: on the Peace River, approximately 15 km upstream of Dunvegan
Township 80, Range 6, W6M
Municipality: Saddle Hills County, Clear Hills County, MD of Fairview No. 136,
MD of Spirit River No. 133.
Activity Type: Power Plant
File #: 001-00387094

Proposal for a 330 megawatt hydroelectric project located on the Peace River, approximately 15 km upstream of Dunvegan, Alberta in northwestern Alberta. Project components would consist of a powerhouse, spillway, headpond, fish passage, access roads, connecting transmission line and substation and other construction related components (e.g. cofferdams, quarries, camp, laydown areas, etc.)

Project Stage: Final Terms of Reference were issued for this project on February 3, 2016.

Awaiting submission of the EIA/Application.

  1. EIA Required Letter - Jun 25, 2015 (1 page, <1 MB)
  2. Project Summary Table - Jun 2015 (5 pages, <1 MB)
  3. Map - Jun 10, 2015 (1 page, <1 MB)
  4. Proposed Terms of Reference - Sep 2015 (24 pages, <1 MB)
  5. PTOR Notice - Sep 2015 (1 page, <1 MB)
  6. Public Comments on PTOR - 17 - Dec 2015 (147 pages, 14.3 MB)
  7. Final Terms of Reference - Feb 3, 2016 (26 pages, <1 MB)
  8. FTOR Notice- Mar 2016 (1 page, <1 MB)
  9. CEAA’s Website

Alberta Transportation

Proponent Project: Springbank Off-Stream Reservoir Project - Latest Update: Feb 11, 2015

Responsible Director: AEP
Location: approximately 11 km west of Calgary
Township 24, Range 4, W5M
Municipality: Rocky View County
Activity Type: Water Management
File #: 387101

Proposal to divert extreme flood flow from the Elbow River into an off-stream reservoir where it would be temporarily contained and later released back into the Elbow River after the flood peak has passed.

Project Stage: Final Terms of Reference were issued for this project on February 5, 2015.

Awaiting submission of the EIA/Application.

  1. EIA Required Letter - Jul 14, 2014 (1 page, <1 MB)
  2. Project Summary Table - Revised - Oct 14, 2014 (3 pages, <1 MB)
  3. Map - Revised - Oct 14, 2014 (1 page, <1 MB)
  4. Proposed Terms of Reference - Revised - Oct 14, 2014 (20 pages, <1 MB)
  5. PTOR Notice - Sep 2014 (1 page, <1 MB)
  6. Public Comments on PTOR - Dec 2014 (97 pages, 1.6 MB)
  7. Final Terms of Reference - Feb 5, 2015 (21 pages, <1 MB)
  8. FTOR Notice - Feb 5, 2015 (1 page, <1 MB)
  9. CEAA’s Website

Benga Mining Limited

Proponent Project: Grassy Mountain Coal Project - Latest Update: Mar 24, 2016

Responsible Director: AER
Location: approximately 7 km north of Blairmore
Townships 8 & 9, Ranges 3 & 4, W5M
Municipalities: Ranchland, Crowsness Pass
Activity Type: Coal
CCA Appl#: 1844520, 1844522

Proposal to construct and operate an open-pit metallurgical coal mine with production capacity of a maximum of four million tonnes of clean coal per year, over a mine-life of about 25 years.

Project Stage: The EIA report and applications were submitted November 2015.

The AER completed a preliminary review of Benga Mining’s Grassy Mountain Coal Project environmental assessment report (EIA) and determined that it is not complete. On January 25, 2016, they requested that Benga re-submit the EIA after addressing a number of major deficiencies.

  1. EIA Required Letter - Nov 21, 2014 (2 pages, <1 MB)
  2. Project Summary Table and Map - Sep 29, 2014 (5 pages, <1 MB)
  3. Proposed Terms of Reference - Nov 17, 2014 (29 pages, 1.4 MB)
  4. PTOR Notice - Dec 2014 (1 page, <1 MB)
  5. Public Comments on PTOR - 6 - Feb 2015 (96 pages, 11.1 MB)
  6. Final Terms of Reference - Mar 19, 2015 (30 pages, <1 MB)
  7. FTOR Notice - Mar 19, 2015 (1 page, <1 MB)
  8. EIA- Nov 2015
  9. AER Application # 1844520- Mar 19, 2015 (1 page, <1 MB)
  10. Public Notice Update- Dec 7, 2015 (3 pages, <1 MB)
  11. CEAA’s Website
  12. Major Deficiencies Letter- Jan 25, 2016 (7 pages, <1 MB)
  13. Major Deficiencies Letter Addendum- Mar 21, 2016 (24 pages, <1 MB)

MEG Energy Corp.

Proponent Project: May River Project - Latest Update: March 3, 2017

Responsible Director: AER
Location: approximately 100 kilometers south of Fort McMurray
Townships 74-79, Ranges 10-14, W4M
Municipalities: Lac La Biche County
Activity Type: In-Situ
File#: 001-00380416

The project would target bitumen resources in the McMurray Formation using steam assisted gravity drainage (SAGD) technology. The project would be developed over three phases with a total planned capacity of about 26 000 m3 per day (164,000 bbl/d). The project would consist of three central processing facilities, natural-gas-fired cogeneration at Phases 1 and 3, associated field facilities, and related infrastructure.

Project Stage: The EIA report and applications were submitted February 2017. A request for supplemental information was requested on May 10, 2017. Awaiting response.

  1. EIA Required Letter- Mar 28, 2016 (2 pages, <1 MB)
  2. Project Summary Table – Revised- Aug 4, 2016 (4 pages, <1 MB)
  3. Map- Mar 17, 2016 (1 page, 2.1 MB)
  4. Proposed Terms of Reference- Apr 6, 2016 (16 pages, <1 MB)
  5. PTOR Notice- Mar 2016 (1 page, <1 MB)
  6. Public Comments on PTOR – 5- May 2016 (120 pages, 2.6 MB)
  7. Final Terms of Reference - Original- Jul 5, 2016 (19 pages, <1 MB)
  8. FTOR Notice- Jul 5, 2016 (1 page, <1 MB)
  9. Final Terms of Reference - Amended - Sep 19, 2016 (19 pages, <1 MB)
  10. Amended FTOR Notice- Sep 19, 2016 (1 page, <1 MB)
  11. EIA- Feb 2017
  12. AER Application #1880245
  13. Public Notice- Feb 28, 2017 (3 pages, <1 MB)

Suncor Energy Inc.

Proponent Project: Lewis - Latest Update: May 10, 2017

Responsible Director: AER
Location: approximately 25 kilometres northeast of Fort McMurray and 18 kilometres southeast of Fort McKay
Townships 91 & 92, Ranges 5-8, W4M
Municipality: Wood Buffalo
Activity Type: In-Situ
File#: TBD

Proposal for in situ extraction with an estimated total bitumen production of 160,000 bpd and an operational life of up to 40 years. The project would be developed in four phases, supported by cogeneration of electricity to be constructed within the first two phases. Project components include gas fired steam generation including some cogeneration, water treatment and recycling, bitumen treatment, multi-well production pads, steam delivery pipelines, product recovery pipelines, local access roads, and borrow pits.

Project Stage: Proposed Terms of Reference available for public comment. Comments due June 29, 2017.

  1. EIA Required Letter- Nov 23, 2016 (2 pages, <1 MB)
  2. Project Summary Table and Map- Nov 17, 2016 (6 pages, <1 MB)
  3. Proposed Terms of Reference- Apr 24, 2017 (19 pages, <1 MB)
  4. PTOR Notice- Apr 24, 2017 (1 page, <1 MB)

Suncor Energy Inc.

Proponent Project: Meadow Creek West – Latest Update: March 3, 2017

Responsible Director: AER
Location: approximately 33 km west of Anzac and 38 km south of south of Fort McMurray
Townships 84 & 85, Ranges 9-12, W4M
Municipalities: Wood Buffalo
Activity Type: In-Situ
File#: TBD

Proposal for in situ extraction with an estimated total bitumen production of 40,000 bpd and an operational life of up to 40 years. Project components would include steam generation including natural gasfired cogeneration, water treatment and recycling, bitumen treatment, multi-well production pads, steam delivery pipelines, product recovery pipelines, local access roads, and borrow pits.

Project Stage: Final Terms of Reference were issued for this project on April 17, 2017. Awaiting submission of the EIA/Application.

  1. EIA Required Letter - Jul 5, 2016 (2 pages, <1 MB)
  2. Project Summary Table - Jun 30, 2016 (3 pages, <1 MB)
  3. Map - May 31, 2016 (1 page, 1.8 MB)
  4. Proposed Terms of Reference - Nov 7, 2016 (19 pages, <1 MB)
  5. PTOR Notice - Jan 2, 2017 (1 page, <1 MB)
  6. Public Comments on PTOR – 3 - Feb 27, 2017 (102 pages, 1.3 MB)
  7. Final Terms of Reference- Apr 17, 2017 (19 pages, <1 MB)
  8. FTOR Notice- Apr 17, 2017 (1 page, <1 MB)

Sunshine Oilsands Ltd.

Proponent Project: Thickwood SAGD Expansion Project - Latest Update: February 3, 2014

Responsible Director: AER
Location: approximately 78 kilometres west of Fort McMurray
Townships 89 - 91, Ranges 18 - 21, W4M
Municipality: MD of Opportunity
Activity Type: In-Situ
File #: 002-00305529

Proposal to expand the Thickwood SAGD Project from 10,000 barrels per day (bbl/d) to approximately 70,000 bbl/d.

Project Stage: Final Terms of Reference were issued for this project on October 28, 2013.

Awaiting submission of the EIA/Application.

  1. Project Summary Table- Jul 23, 2013 (4 pages, <1 MB)
  2. Map- Jul 2013 (1 page, 1.5 MB)
  3. Proposed Terms of Reference- Jul 30, 2013 (18 pages, <1 MB)
  4. PTOR Notice- Aug 2013 (1 page, <1 MB)
  5. Public Comments on PTOR - 2- Oct 2013 (43 pages, 3.5 MB)
  6. Final Terms of Reference- Oct 28, 2013 (19 pages, <1 MB)
  7. FTOR Notice- Jan 2014 (1 page, <1 MB)

Syncrude Canada Ltd.

Proponent Project: Mildred Lake Mine Extension (MLX) - Latest Update: December 1, 2016

Responsible Director: AER
Location: approximately 40 kilometres north of Fort McMurray
Townships 91 - 93, Ranges 11 & 12, W4M
Municipality: Wood Buffalo
Activity Type: Oil, Mine
EPEA Appl#: 034-00000026
OSCA Appl#: 1820856
WA Appl#: 00263298-005, 00363203-001

Proposal consists of two additional mining areas and affiliated perimeter features within and adjacent to the current operating and approved mining areas. The project is designed to sustain bitumen production levels at the Mildred Lake facility after depletion of the current approved mining areas, which is expected in 2024. The estimated mineable resource in the project area is 117 million m3 (738 million barrels) of recoverable bitumen.

Project Stage: The EIA and applications were submitted December 2014.

Requests for supplemental information were sent to the company on October 9 and December 9, 2015, and June 3 and July 22, 2016.

On February 12 and November 28, 2016, the company submitted supplemental information.

A request for additional supplemental information was sent to the company on March 27, 2017.

The company submitted supplemental information on April 13, 2017, which is under review.

  1. EIA Required Letter- Jun 5, 2013 (1 page, <1 MB)
  2. Project Summary Table- Aug 6, 2013 (2 pages, <1 MB)
  3. Map- Sep 2012 (1 page, 1.4 MB)
  4. Proposed Terms of Reference- Jul 31, 2013 (22 pages, <1 MB)
  5. PTOR Notice- Sep 2013 (1 page, <1 MB)
  6. Public Comments on PTOR - 2- Oct 2013 (49 pages, 7.0 MB)
  7. Final Terms of Reference- Dec 16, 2013 (23 pages, <1 MB)
  8. FTOR Notice- Jan 2014 (1 page, <1 MB)
  9. EIA- Dec 2014
  10. OSCA Application # 1820856
  11. Public Notice- Jan 19, 2015 (4 pages, <1 MB)

Town of Canmore

Proponent Project: Cougar Creek Debris Flood Retention Structure - Latest Update: January 3, 2017

Responsible Director: AEP
Location: on Cougar Creek, approximately 2 km northwest of the Trans-Canada Highway
Township 24, Range 11, W5M
Municipality: MD of Bighorn
Activity Type: Water Management
File #: 384210

Proposal for a debris flood retention structure on Cougar Creek that will be approximately 30 meters high and will span a bedrock confined channel. During a flood event the structure will be designed to hold back up to 600,000 cubic meters of water and debris. The structure will not permanently hold water.

Project Stage: The EIA report was submitted August 2016.

A request for supplemental information was sent on December 21, 2016. Awaiting response.

  1. EIA Required Letter- Feb 12, 2015 (1 page, <1 MB)
  2. Project Summary Table- Jan 27, 2015 (3 pages, <1 MB)
  3. Map- Feb 2015 (1 page, 10.0 MB)
  4. Proposed Terms of Reference- Sep 24, 2015 (19 pages, <1 MB)
  5. PTOR Notice- Oct 2015 (1 page, <1 MB)
  6. Public Comments on PTOR - 2- Jan 2015 (7 pages, <1 MB)
  7. Final Terms of Reference- Mar 21, 2016 (21 pages, <1 MB)
  8. FTOR Notice- Apr 2016 (1 page, <1 MB)
  9. EIA- Aug 2016
  10. Public Notice- Sep 6, 2016 (1 page, <1 MB)

To view current or historical environmental impact assessments (EIAs), please see the Environmental Impact Assessments webpage or contact the respective company.

EIAs can also be viewed at:

Alberta Government Library
44 Capital Boulevard, 11th Floor
10044-108 St
Edmonton, AB
Phone: 780 427-2985

The library catalogue can be searched online through:

When searching the catalogue use the term 'environmental impact' and the name of the project or proponent of the project.

 